Purchased components
Motors, PLCs, drives, burners and instrumentation come from outside suppliers. In peak season their lead times extend sharply, and this is the single most common reason a shipment date moves.
Lead Time & Delivery Process
Every schedule below is measured from order confirmation. Single machines and complete lines are quoted separately, standard and customized configurations have different windows, and ocean transit is given by destination region, so you can plan the factory, the staff and the launch date before you sign.
Five stages, each with a measured window. The only stage that depends on your side is the last one, which runs faster when power, air, water and lifting are ready before our engineers arrive.
Layout drawing, utility requirements and the final configuration are locked in, together with the customized parts if any.
Fabrication, assembly and electrical wiring in our own workshop. Purchased components such as motors, PLCs, drives and burners are ordered at this stage, because they are the item most likely to move the date.
15–30 days single machine · 30–60 days complete lineThe line is assembled and run before it leaves, then packed for export and handed to the carrier with the shipping documents.
Port-to-port transit from Shanghai. Schedules are confirmed with the carrier before booking, and the departure date is shared with you in writing.
7–60 days depending on destinationOur engineers level the machines, set the process parameters, run the first production and train your operators and maintenance team.
15–60 days depending on line sizeCounted from order confirmation to shipment. A line that includes customized parts needs additional engineering and machining time, which is why the customized window is longer than the standard one.
Working days from order confirmation to shipment
| Configuration | Single machine | Complete production line |
|---|---|---|
| Standard configuration | 15–30 days | 30–60 days |
| With customized configuration | 25–40 days | 40–70 days |
Approximate port-to-port transit from Shanghai. Inland haulage and customs clearance at destination are additional and are handled by your forwarder or, if you prefer, arranged with ours.
Approximate transit time, subject to carrier schedule
| Destination region | Transit time | Typical planning note |
|---|---|---|
| Southeast Asia | 7–15 days | Shortest route, easiest to align with a factory shutdown window |
| Middle East | 30–40 days | Direct services available to the main ports |
| Europe | 40–50 days | Plan the arrival after your site preparation is signed off |
| South America | 40–50 days | Allow extra time for destination clearance in peak months |
| Africa | 50–60 days | Longest route, book the vessel as early as the order allows |
The window below assumes that power, compressed air, water and lifting equipment are ready at your factory when our team arrives. If they are not, the installation date moves by the same number of days that site preparation takes.
On-site days for installation, commissioning and operator training
| Line size | On-site duration | Included in the window |
|---|---|---|
| Small production line | 15–30 days | Mechanical installation, electrical connection, commissioning, operator training |
| Medium production line | 25–40 days | Mechanical installation, electrical connection, commissioning, operator training |
| Large production line | 45–60 days | Mechanical installation, electrical connection, commissioning, operator training |
Three factors account for almost every delay we see. Two of them are predictable, so they can be planned around at the quotation stage rather than discovered later.
Motors, PLCs, drives, burners and instrumentation come from outside suppliers. In peak season their lead times extend sharply, and this is the single most common reason a shipment date moves.
Orders placed in the weeks before a busy season queue behind existing production. We tell you at quotation time whether your slot falls inside this window.
Before and after a major exhibition, workshop capacity is partly reserved for machines on display and for the orders that follow the show.
When a supplier notifies us of a delayed delivery, we pass it on within 24 hours by email, by phone and by instant messaging, together with the revised shipment date and the reason for the change. You never learn about a delay from the shipping schedule.
The five questions buyers ask most often before they place an order.
A standard complete line takes 30–60 days from order confirmation to shipment. If the line includes customized parts, the same line takes 40–70 days. Single machines are faster: 15–30 days in standard configuration and 25–40 days with customization.
Transit from Shanghai is about 7–15 days to Southeast Asia, 30–40 days to the Middle East, 40–50 days to Europe, 40–50 days to South America and 50–60 days to Africa. The exact port-to-port time is confirmed with the shipping schedule before booking.
With power, air, water and lifting conditions ready at the factory, installation, commissioning and operator training take 15–30 days for a small line, 25–40 days for a medium line and 45–60 days for a large line.
Purchased components are the single most common cause, because supplier lead times extend sharply in peak season. Peak season itself adds 25–30 days to the production schedule, and orders placed right before or after a trade exhibition add 15–20 days.
Once a supplier notifies us of a delay, we pass it on within 24 hours by email, phone and instant messaging, together with the revised shipment date and the reason for the change.
Send your product, target capacity and destination port. We will come back with the production window, the sailing date and the on-site days for your exact configuration.